Skip to content

Grapevine · Euless · Coppell · Southlake

Free quotes at (817) 646-8160, plus a 1-year warranty on every job

(817) 646-8160
Remodeler kneeling on cardboard floor protection, driving screws into a new drywall sheet on fresh wood framing, with an open kitchen and range hood behind

ServicesWhole Home Remodeling

Whole Home Remodeling in Grapevine

When more than one room needs work, you deserve one plan and one set of faces. We remodel kitchens, bathrooms and living spaces together, with the same small crew in your home every day, so nothing gets lost between rooms or between trades.

One plan for the whole house

Remodeling the whole home makes sense when its problems are tied together. The kitchen layout works against the living room, both bathrooms came from the same era, and the floor changes three times on the way from the front door to the back patio. Tackling rooms one by one often means opening the same walls twice and living with finishes that never line up.

We plan every room first, then build in a logical order. Rough plumbing and wiring go in before walls close, flooring runs unbroken where it belongs, and paint waits until the dusty work is over. With a small team, the people who tour your home at the start are the ones doing the work and returning the house to you at the end.

Only need a single room done? Our kitchen remodeling and bathroom remodeling pages describe those projects by themselves.

What we can take on in a whole home remodel

New layouts and walls taken out

Connecting the kitchen to the family room or reshaping a tight hallway. Before any wall comes out we confirm whether it carries weight, and if it does, we plan the beam or support to replace it.

Kitchen and bath done as one project

Planning both rooms together lets them share plumbing runs on one schedule. You also pick fixtures and finishes once, so the rooms match instead of looking like two separate projects.

Flooring from room to room

One flooring run through the main living spaces, with doorway transitions planned from the start rather than patched in afterward. We inspect the subfloor as we go and fix soft or uneven areas before new flooring is laid.

Walls, trim and paint

New drywall, patched cracks, fresh baseboards and door casings, and paint after the heavy work wraps up. Leaving these for the end keeps the new surfaces clean.

Plumbing and wiring upgrades

Relocating fixtures, putting outlets where you will use them and updating older wiring or supply lines to current code in the areas the remodel reaches.

Permits and inspections

Structural, plumbing and electrical work usually needs city approval first. We apply for it, schedule each inspection at the right point in the build and let you know before it happens, so paperwork does not hold up the job.

Signs your home is ready for more than one room

  • Every room has the same dated look

    If the kitchen, bathrooms and floors were all installed around the same time, they tend to wear out together. Updating them together costs less in disruption than three separate projects.

  • The layout no longer fits how you live

    Closed-off kitchens, formal rooms nobody uses and narrow halls are common in homes built a few decades ago. A whole-home plan can reclaim that space.

  • Past projects never matched

    Different flooring in every room, mismatched trim, or one remodeled bathroom next to an original one. A single plan ties it all back together.

  • Cracks and sticking doors keep showing up

    Shifting clay soil around the Grapevine area can crack drywall and throw door frames out of square. When you are remodeling anyway, we can repair that damage properly and point out anything that needs a foundation specialist first.

  • You plan to stay for years

    If this is the house you want to grow into, doing the work once and doing it right usually makes more sense than patching room by room.

The steps of a whole home remodel

  1. 1

    Room-by-room visit and free quote

    We go through each room with you, hear what frustrates you about the house and measure everything. Your free quote splits the work out room by room, so the cost of each part is clear.

  2. 2

    Setting the order of work

    We decide which rooms come first and how long each phase should run. If you stay home during the work, the plan keeps a bathroom working and leaves a spot for simple meals.

  3. 3

    Permits, materials and protection

    We get the permits, order materials early and cover the floors and rooms outside the work area. Dust barriers are up before any demolition begins.

  4. 4

    One crew through every phase

    Our small team carries the job from tear-out to finish work. You know who is knocking each morning and who can answer your questions. If an opened wall reveals a problem, we share photos and lay out your choices before changing anything.

  5. 5

    Walkthrough and cleanup

    We tour each room with you, take care of anything on your list and clean the house before calling the job finished.

What moves the cost of a whole home remodel

No two whole-home projects price out the same, which is why we quote after seeing your home, not before. Your quote lists each room and each major task separately. If something changes along the way, you hear about it and approve it before we do the work.

How many rooms and how much square footage
The number of rooms and the size of each one set the baseline for labor and materials.
Moving walls, plumbing or wiring
Keeping fixtures where they are costs less than relocating them. Removing a load-bearing wall adds a beam and engineering work.
What we find behind the walls
Water damage, old wiring or subfloor rot can add work. We price the visible scope up front and talk with you right away if something hidden turns up.
Your material choices
Flooring, fixtures and finishes range widely in price. We can show you where spending more makes a real difference and where it does not.
Phasing and living at home
Working around a family that stays in the house takes more planning and sometimes more days than working in an empty home.

What homeowners ask about remodeling several rooms

Something not covered here? (817) 646-8160

Can our family stay in the house while you work?

Plenty of families stay put. We split the job into phases so a bathroom and some living space stay usable, and we put up dust barriers around the rooms being worked on. On a very large job, we will give you a straight answer about whether moving out for a stretch would make life easier.

How much time does a whole home remodel need?

That comes down to the number of rooms, whether we move walls or plumbing, and how fast the city handles permits and inspections. Your quote comes with a timeline broken into phases, and we check in as each one finishes.

Does the whole house have to be done in one go?

Not at all. Some owners map out every room now and build in stages over the years. A full plan still pays off early, since rough plumbing and wiring can be laid out to suit the later phases.

Will I see the same crew from start to finish?

You will. We stay a small team by choice, and the people who begin your project are the people who complete it. No rotating crews or new faces each week.

Who deals with permits?

We file for the permits your project needs and book the city inspections. We tell you ahead of time when an inspector will visit and what they will look at.

Do you take jobs beyond Grapevine?

Yes. We handle whole-home work in nearby towns such as Southlake, Colleyville, Coppell and Euless. The rest of the towns we cover are on our Service Areas page.

Remodeled kitchen seen from a dining table: white shaker cabinets, white island with wood-top stools, subway tile backsplash, range hood and glass pendant lights

Let's walk through your home together

Tell us which rooms are bothering you and what you want them to do for your family. We will come out, look at everything and put together a free quote with every room broken out.